The 10-Minute Builder-Proof Asbestos Checklist
- Lewis Evans
- Oct 6
- 1 min read
✅ The 10-Minute Checklist
Scope clarity | List exactly where you’ll cut, chase, remove, or drill.
Survey match | Do you have a Refurbishment Survey for those areas (not just a Management Survey)?
Drawings/mark-ups | Mark penetrations & removals; we’ll target those zones.
Access plan | Keys, loft access, cupboards cleared, voids opened.
Occupancy | Rooms clear for intrusive checks & sampling.
ACM hotspots | Watch for:
🎨 Textured coatings
🟫 Vinyl tiles
🏠 Soffits & undercloaking
🪵 Cement boards
📦 Old boxing-in
Prefab alert | Prefab elements = extra loft/wall sampling.
Lab turnaround | UKAS lab results 1-3 working days.
Documentation | You’ll receive:
📑 HSG264-compliant report
🧪 UKAS sample certificates
✅ Clear recommendations

If it’ll be disturbed, it gets checked. No guesswork, no stoppages.