The 10-Minute Builder-Proof Asbestos Checklist




✅ The 10-Minute Checklist

  1. Scope clarity | List exactly where you’ll cut, chase, remove, or drill.

  2. Survey match | Do you have a Refurbishment Survey for those areas (not just a Management Survey)?

  3. Drawings/mark-ups | Mark penetrations & removals; we’ll target those zones.

  4. Access plan | Keys, loft access, cupboards cleared, voids opened.

  5. Occupancy | Rooms clear for intrusive checks & sampling.

  6. ACM hotspots | Watch for:

    • 🎨 Textured coatings

    • 🟫 Vinyl tiles

    • 🏠 Soffits & undercloaking

    • 🪵 Cement boards

    • 📦 Old boxing-in

  7. Prefab alert | Prefab elements = extra loft/wall sampling.

  8. Lab turnaround | UKAS lab results 1-3 working days.

  9. Documentation | You’ll receive:

    📑 HSG264-compliant report

    🧪 UKAS sample certificates

    ✅ Clear recommendations




Infographic titled The 10-Minute Builder-Proof Asbestos Checklist showing key steps for contractors before starting work, including survey match, scope clarity, ACM hotspots, prefab alert, and documentation reminders.
The builder-proof asbestos checklist: 10 quick steps to protect your project and margin.



If it’ll be disturbed, it gets checked. No guesswork, no stoppages.


📍 Ready to Book?






 
 
Member badge of local surveyor direct
Construction line member associate badge
  • LinkedIn
  • Whatsapp
  • Facebook
  • Google Places
  • Twitter

07859 895311

©2022 by Breathe Environmental Services. Proudly created with Wix.com

bottom of page